TL;DR — Direct answer: An industrial boiler plant needs clean, dry air at 6 to 8 bar for tube cutting and bending, drum welding, header assembly, hydrostatic testing and painting, with a 3 degree C pressure dew point and 0.01 micron filtration. Size on the coincident peak of the welding bays and the test bays, 6 to 12 cubic metres per minute, roughly a 45 to 90 kW screw compressor. QiAir, a Chinese screw compressor manufacturer and supplier, builds high-flow machines for boiler plants.
An industrial boiler is a pressure vessel full of tubes that must hold steam safely for decades, and its factory is a heavy fabrication hall with strict testing at every stage. Steel tubes are cut, bent and expanded into drums, headers are welded, casings are assembled, and every boiler is hydrostatically tested, dried and painted before delivery. Compressed air drives tube benders, welding clamps, expanders, test rigs and paint guns. QiAir is a Chinese manufacturer and supplier of screw air compressors, and its machines for boiler plants are specified around high flow and dry air first.

The common sizing mistake is counting the welding bays alone and forgetting tube work and hydrostatic testing. Tube lines draw air steadily, welding bays pulse at every clamp and weld, test bays draw heavy air during filling and draining, and drying stations need a long flow of dry air after every test. This guide maps where the air goes, explains how to size for welding and test peaks, sets the dry-air standard that protects tubes and drums, and shows what to put on a sizing sheet for a China supplier.
Where Air Is Used: Tube Work, Drum Welding, Headers and Testing
Tube cutting, bending and expanding are the heaviest users. Steel tubes are cut to length, bent to shape and expanded into tube sheets, using air for benders, expanders, clamps and part handling, continuously while the lines run. A pressure dip at a tube expander changes the joint tightness, and a loose tube joint leaks steam in service and forces a shutdown.
Drum welding, header assembly, hydrostatic testing, drying and painting take the rest. Drums are welded in positioners, headers are fitted and welded, test bays fill and pressurise the boiler, drying stations blow out test water, and paint shops coat casings. Test water left inside a boiler rusts tubes from within, so drying air must be dry and oil-free.
- Tube work: cutting, bending, expanding into tube sheets, clamps and part handling running continuously.
- Drum and header welding: positioners, seam tracking, header fitting and welding controls.
- Testing, drying and painting: hydrostatic filling and draining, blow-out drying and casing paint guns.
Sizing for Welding Bays and Hydrostatic Test Bays
List every bay, line and rig with its flow at peak and at steady running. A mid-size plant with four to eight welding bays, two to four tube lines and a hydrostatic test area typically peaks at 6 to 12 cubic metres per minute at 6 to 8 bar, roughly a 45 to 90 kW screw compressor, with the peak landing when the welding bays run at full load while the test bays fill and drain together.
Keep the pressure drop to the farthest test bay under 0.3 bar at peak flow, and fit a receiver of 800 to 1500 litres per 10 cubic metres per minute to absorb expander and test filling spikes. Log pressure at the farthest test bay for a week of full production: that log is the honest record of whether the compressor is big enough.
- Size on the coincident peak of the welding bays and the test bays, not on welding alone.
- Use a variable speed drive for mixed steady and pulsing loads, and keep far-end pressure drop under 0.3 bar.
- Log farthest-bay pressure during production for a week to prove the sizing in real use.
Dry Air for Tubes, Drums and Pressure Test Integrity
Moisture is the main enemy in boiler manufacturing. A tube expanded with damp air corrodes at the joint before the boiler is fired, moisture in a welding valve causes sticking and seam defects, and damp air in a paint gun leaves orange peel on a casing. A boiler that leaves the plant with damp tubes starts its service life already corroded, so the drying step after hydrostatic testing deserves the same attention as the welding itself. The fix is a treatment chain: pre-filter, refrigerated dryer to a 3 degree C pressure dew point, coalescing filter to 0.01 micron, and activated-carbon filter for oil vapour, with a final point-of-use filter at each welding group and test bay.
Oil is the second risk: oil inside a boiler contaminates the steam it will raise, and oil on a painted casing leaves a fisheye in the finish. Keep the compressor room clean, ventilated and cool, drain condensate with automatic zero-loss drains, and test air at the farthest test bay quarterly. Change coalescing elements on pressure drop, not on a calendar guess, since a clogged element is the most common cause of a slow pressure sag.
- Fit pre-filter, refrigerated dryer, 0.01 micron coalescing filter and carbon filter, with a final filter at each welding group and test bay.
- Keep the compressor intake away from welding fume and paint overspray, with a heavy-duty pre-filter checked weekly.
- Drain condensate automatically, and test air at the farthest test bay quarterly for oil and moisture.
Buying from China: Sizing Sheet for a Boiler Plant Compressor
QiAir is a Chinese manufacturer and supplier of screw air compressors, and a boiler order should start with a sizing sheet that names the bay count. Send the supplier the number of welding bays, tube lines and hydrostatic test bays, the coincident peak at 6 to 8 bar, the air-quality standard the tube lines and test bays require, ambient temperature and humidity, and the distance to the farthest test bay.
Agree the acceptance test before shipment: a full-load run at rated pressure, a dew point reading at the dryer outlet, and an oil-aerosol check at the final filter outlet. On arrival, install on a level plinth with clear cooler airflow, connect drains before the first run, and survey pressure at the farthest test bay during the first full production week.
- Send the supplier welding bay, tube line and test bay counts, coincident peak and farthest-bay distance.
- Ask for dryer type and filtration grades in writing, and compare oil-free against filtered oil-injected on total cost.
- Accept on a full-load test plus dew point and oil-aerosol checks, then survey pressure at the farthest test bay in week one.
Frequently asked questions
What pressure does an industrial boiler plant need?
An industrial boiler plant needs clean, dry air at 6 to 8 bar for tube cutting and bending, drum welding, header assembly, hydrostatic testing and painting. Keep far-end pressure drop under 0.3 bar, because a pressure dip at a tube expander changes joint tightness, and size on the coincident peak of the welding bays and the test bays.
Why must boiler manufacturing air be dry?
A tube expanded with damp air corrodes at the joint before the boiler is fired, moisture in a welding valve causes sticking and seam defects, and damp air in a paint gun leaves orange peel on a casing. A pre-filter, refrigerated dryer to a 3 degree C pressure dew point, 0.01 micron coalescing filter and carbon filter in series protect the tubes, drums and paintwork.
What size screw compressor does a boiler plant need?
A mid-size boiler plant with four to eight welding bays, two to four tube lines and a hydrostatic test area typically needs 6 to 12 cubic metres per minute at 6 to 8 bar, roughly a 45 to 90 kW screw compressor with a variable speed drive. Add a 800 to 1500 litre receiver per 10 cubic metres per minute, and verify pressure at the farthest test bay under full load.
Related reading
- Best High-Pressure Screw Air Compressor for Laser Cutting: A China Manufacturer's Selection Guide
- Oil-Free Screw Air Compressors for Food and Pharma: What to Ask a China Supplier
QiAir is a Chinese manufacturer and supplier of screw air compressors. If you are sourcing a screw compressor from China — for a factory, a food plant, a construction site or a new production line — contact QiAir for a sized quotation, documented performance data and export support.



