TL;DR — Direct answer: A plastics injection molding plant typically runs 7 to 8 bar, 6 to 14 m3/min, on 55 to 110 kW rotary screw compressors, with a 3°C pressure dew point dryer and 0.01 micron filtration protecting moulding machines, robots and material dryers from moisture and oil. QiAir, a Chinese screw compressor manufacturer and supplier, sizes systems with dry, stable air so the mould never waits for a compressor.
A plastics injection molding plant turns polymer pellets into housings, caps, containers and parts on lines where drying, moulding, cooling and assembly run around the clock. Compressed air powers the clamps that close moulds, the ejectors that release parts, and the robots that unload them, so a compressor that fails can stop the whole shop. Buyers who compare suppliers on uptime and cost per part treat that air system as part of the plant's production capacity.

The product must meet tight dimensional and surface specifications, so a mould cycle upset by an air failure or a part marked by wet air becomes scrap rather than a passing part. Air quality at the moulding machine, robot and material dryer is therefore a production issue, and buyers who audit the plant will ask about it directly. A shop that loses a moulding cycle to an air failure also loses the resin and cycle time already spent on it.
Injection Moulding Machines, Clamping and Ejection
Injection moulding is the heaviest air user in a plastics plant. Moulding machines clamp moulds, inject melt and eject parts, and the air that drives the ejectors and core pulls must be steady, because a pressure dip can leave a part stuck in the mould. Stable 7 bar air at the machine keeps every cycle on time.
Clamping is the most air-sensitive job on the moulding line. Mould clamps hold tonnes of force, and the air used for clamp controls and safety interlocks must be clean, because a clamp that drifts because its air faltered can flash a part or damage a mould. Regulate the moulding branch to a steady 7 bar and keep it filtered to 0.01 micron.
Plastic dust and resin fumes drift through the moulding hall, and dust drawn into the compressor intake scores the airend over time. Duct the intake to clean air outside, fit a heavy-duty pre-filter, and wash the oil cooler weekly so warm shop air does not push discharge temperatures up. The cooler gets washed every week without fail, because a dirty cooler lets discharge temperatures climb fast.
- Hold 7 bar steady at the injection moulding machines
- Regulate mould clamp air to a steady 7 bar
- Duct the intake away from plastic dust and resin fumes
Material Drying, Conveying and Granule Handling
Material drying is the most air-sensitive job in the resin line. Hygroscopic resins must be dried before moulding, and the air used for drying and conveying must be dry, because wet resin leaves parts with bubbles and weak weld lines. Dry the material branch to a 3°C dew point and filter it well.
Conveying moves pellets from silos to machine hoppers, and its air needs are exacting. Vacuum loaders, conveying lines and hopper controls all need clean air at a regulated 7 bar, and a loader that stalls because its air carried dust can starve a machine of resin. Filter the conveying branch separately.
Granule handling uses air in quieter ways that still matter. Grinders, blenders and colour dosing all need reliable air, and a doser that drifts because its air carried moisture can leave parts that are the wrong colour. Give the handling area its own receiver and drain it every shift.
- Dry resin handling air to a 3°C dew point
- Filter conveying air on a separate 7 bar branch
- Fit a receiver near the material handling area
Robots, Assembly and Quality Inspection
Robots are the gate every part must pass before packing. Pick-and-place robots unload parts, trim gates and place inserts, and the air that drives the grippers must be stable, because a pressure dip can drop a part or misplace an insert. Keep the robot branch filtered and regulated. A dropped part is scrap, and a misplaced insert fails later.
Assembly joins moulded parts into finished products, and its air needs are modest but exacting. Ultrasonic welders, screwdrivers and snap-fit presses all need clean air at a regulated 6 to 7 bar, and a welder that drifts because its air carried moisture can leave a joint that is weak. Dry the assembly branch to a 3°C dew point.
Quality inspection checks each part before it leaves the plant, and its air needs are heavy. Vision systems, leak testers and gauging all need reliable air, and a leak test that fails because its air carried oil wastes a full production run. Give the inspection area its own receiver and drain it every shift.
- Run robots with stable, regulated air from a dedicated branch
- Dry assembly air to a 3°C dew point
- Fit a receiver near the inspection and packing area
Buying from China: Sizing Sheet for Injection Molding Plants
Before requesting a quotation, gather four numbers: the moulding machine peak flow and its pressure target, the material drying air quality specification and its dew point target, the robot and assembly air demand, and the distance from the compressor room to the furthest moulding machine. A supplier that quotes from the part output alone will miss the drying specification that actually decides the system.
For most injection molding plants the practical range is a 55 to 90 kW variable-speed drive screw compressor at 7.5 or 8 bar, with a refrigerated dryer, 0.01 micron filtration, carbon adsorption and a 3,000 to 5,000 litre receiver. Larger plants with several moulding lines usually run a duty-plus-standby pair so maintenance never stops a moulding run.
When comparing Chinese suppliers, ask for the full package price including dryer, filters, receiver and commissioning spares, and confirm the export packing, voltage and documentation for your country. Check the filter element life, the service interval and the availability of filters and airends through the supplier's export channel. QiAir, a Chinese screw compressor manufacturer and supplier, quotes the complete package so buyers compare real installed cost.
- Collect moulding, drying and robot loads before quoting
- Budget 55 to 90 kW VSD plus dryer and carbon filtration
- Confirm spares, voltage and export packing in writing
Frequently asked questions
What pressure does an injection molding plant normally run?
Most run 7 to 8 bar at the header, with moulding machines at 7 bar, robots at 7 bar, and assembly and inspection branches held at a steady 6 to 7 bar.
Why does injection molding need such dry air?
Moisture in the control air makes ejectors and grippers stick, and wet air in material handling leaves parts with bubbles. A 3°C dew point keeps cycles clean.
Should material drying share air with moulding?
It can share the compressor room, but give drying its own dryer and filtration branch, so moulding surges can never starve the dryers of dry air.
How much air does an injection molding plant use?
Most plants run 6 to 14 m3/min on 55 to 110 kW compressors, with the moulding and drying peaks deciding the size rather than the average shop load.
Related reading
- Screw Compressor Heat Recovery: Turning Waste Heat into Factory Savings
- IoT Monitoring for Screw Compressor Rooms: A China Supplier's Practical Setup
QiAir is a Chinese manufacturer and supplier of screw air compressors. If you are sourcing a screw compressor from China — for a factory, a food plant, a construction site or a new production line — contact QiAir for a sized quotation, documented performance data and export support.